How to reduce the maintenance frequency of small rollers?

Publication Date: Apr 24, 2023

1682314474828706.jpg

In daily life, small road rollers are still relatively busy, and it is precisely because of the high frequency of use that the equipment often has some minor problems. Although these minor problems will not directly affect the equipment, a lot of manpower and material resources are still wasted. and time for repairs. So how to reduce the maintenance frequency of small rollers? Let me talk about it briefly, I hope it can bring you useful information!


Since construction machinery is a special vehicle, operators should receive training and guidance from the manufacturer, have a sufficient understanding of the structure and performance of the machine, and obtain certain operating and maintenance experience before operating the machine. The product use and maintenance manual provided by the manufacturer is the material for the operator to operate. Before operating the machine, be sure to read the use and maintenance manual, and operate and maintain according to the requirements of the manual.


Pay attention to the workload during the running-in period. Generally, the workload during the running-in period should not exceed 80% of the rated workload, and an appropriate workload should be deployed to prevent overheating caused by the continuous operation of the machine for a long time.


Pay attention to check the level and quality of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) frequently, and check the tightness of the whole machine. During the inspection, it is found that there is too much oil and water shortage, and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that during the running-in period, grease should be added to the lubrication points every shift (except for special requirements).


In short, the requirements for the use and maintenance of small road rollers during the running-in period can be summarized as: strengthen training, reduce load, pay attention to inspection, and strengthen lubrication. As long as we pay attention to and implement the maintenance and maintenance of construction machinery during the running-in period as required, the occurrence of early failures will be reduced.

All products are guaranteed for 12 months!